HVAC Design
&
Retrofit

Chilled Water system

Chillers, AHU/FAHU/FCU

Designing and retrofitting a chilled water system involves several key considerations, including the selection and sizing of chillers, air handling units (AHUs), and fan coil units (FCUs). Here are the general steps involved in the design and retrofit process:

HVAC & Retrofit Process

Revitalizing Indoor Spaces
Navigating the HVAC Retrofit Process for Enhanced Comfort and Efficiency

Load Calculation

Our team begins by conducting a detailed load calculation to determine the cooling requirements of the space or building. Factors such as the size, orientation, occupancy, lighting, and equipment heat gain are considered. This calculation will help determine the cooling load in terms of tonnage or kilowatts.

Chiller Selection

Our chiller expert are selecting the appropriate chillers considering factors such as capacity, energy efficiency, and the type of refrigerant used. Evaluate the different types of chillers available, including centrifugal, screw, and scroll compressors, and choose the one that best meets the cooling load requirements and efficiency goals.

Chiller Sizing

Proper chiller sizing is crucial to ensure optimal performance and energy efficiency. Consider factors such as the cooling load, ambient conditions, and part-load operation. Oversized or undersized chillers can lead to inefficiencies and increased energy consumption. Consult manufacturer specifications and work with a mechanical engineer to determine the right chiller size.

Piping and Distribution System

Design a well-insulated piping network to distribute chilled water from the chiller plant to the air handling units and fan coil units. Consider pipe sizing, insulation thickness, and pressure drop calculations. Use materials compatible with chilled water systems, such as steel or copper pipes. Incorporate appropriate valves, strainers, and balancing devices to ensure proper flow control.

Air Handling Units (AHUs/FAHUs)

(F)AHUs are responsible for conditioning and distributing air throughout the building. Evaluate the existing (F) AHUs and determine if they need to be replaced or retrofitted. Consider factors such as air volume, filtration, and energy efficiency. AHUs may need modifications to accommodate the chilled water system, such as adding cooling coils and control dampers.

Fan Coil Units (FCUs)

FCUs are typically used in individual spaces to provide localized cooling. Assess the existing FCUs and determine if they can be retrofitted or replaced. Ensure the FCUs are compatible with chilled water systems and have the appropriate cooling coils and control valves. Consider factors such as noise levels, energy efficiency, and airflow distribution.

Controls and Automation

Incorporate a control system that allows for efficient operation, monitoring, and optimization of the chilled water system. Consider using a building management system (BMS) or direct digital control (DDC) system to regulate temperature setpoints, control sequences, and enable energy-saving strategies such as variable speed drives and free cooling.

Energy Efficiency and Sustainability

When retrofitting a chilled water system, prioritize energy efficiency and sustainability. Consider incorporating energy-efficient components, such as high-efficiency chillers, variable speed drives, and advanced control strategies. Evaluate the possibility of utilizing renewable energy sources or waste heat recovery to reduce the environmental impact of the system.

Commissioning and Maintenance

Once the retrofit is complete, conduct thorough commissioning to ensure the system is operating as intended. Establish a preventive maintenance plan to regularly inspect and maintain the equipment, including chillers, AHUs, FCUs, and associated components. Regular maintenance will help optimize system performance and extend its lifespan.

Our Services

Designing and retrofitting split systems, including package units, split units, and variable refrigerant
volume (VRV) systems, involves several key considerations. Here’s an overview of the design and retrofit
process for each system:

industrial-hvac-Saneg-energy

Package Unit

Split Unit

VRV-Saneg-energy

Variable Refrigerant Volume (VRV)

Have any question about us?

Don’t hesitate to contact us

Our Featured Services

We Provide All Exclusive
Services For Clients

Controls System & Smart Solution
Integrated systems that monitor and control various building/facilities functionalities to ensure efficient and optimal operation.
Solar & Energy Efficiency
Various services related to the design, installation, maintenance to help businesses, and organizations harness the power of solar energy.
Industry 4.0
Transformative approach to manufacturing and industrial processes that leverages advanced digital technologies
Consultancy Services
Planning, organization, coordination, and execution of projects to ensure successful completion within predefined constraints such as time, budget, scope, and quality.

Our Clients

Businesses And Organizations
Use Saneg Energy

Scroll to Top